What does EDIV mean?
EDIV means Engineering Design Intent Verification
This acronym/slang usually belongs to Governmental & Military category.
Particularly in Engineering Abbreviations, NASA Abbreviations
Particularly in Engineering Abbreviations, NASA Abbreviations
What is the abbreviation for Engineering Design Intent Verification?
Engineering Design Intent Verification can be abbreviated as EDIV
|
|
Most popular questions people look for before coming to this page
Q: A: |
What does EDIV stand for? EDIV stands for "Engineering Design Intent Verification". |
Q: A: |
How to abbreviate "Engineering Design Intent Verification"? "Engineering Design Intent Verification" can be abbreviated as EDIV. |
Q: A: |
What is the meaning of EDIV abbreviation? The meaning of EDIV abbreviation is "Engineering Design Intent Verification". |
Q: A: |
What is EDIV abbreviation? One of the definitions of EDIV is "Engineering Design Intent Verification". |
Q: A: |
What does EDIV mean? EDIV as abbreviation means "Engineering Design Intent Verification". |
Q: A: |
What is shorthand of Engineering Design Intent Verification? The most common shorthand of "Engineering Design Intent Verification" is EDIV. |
Abbreviations or Slang with similar meaning
- EDT-C - Engineering Design Testing, Contractor
- EDT-C/G - Engineering Design Testing - Contractor/Government
- DCVR - Design Clarification Verification Request
- DFV - Design For Verification
- DUV - Design Under Verification
- EDVT - Engineering Design Verification Test
- DAV - Design and Verification
- DCV - Design Change Verification
- DID - Design Intent Documentation
- DIE - Design Intent Engineering
- DIV - Design Information Verification
- DOVE - Design Oriented Verification and Evaluation
- DID - Design Intent Document
- DI - Design Intent
- DRVP - Design requirements verification procedure
- DVR - Design and Verification Routine
- dvt - Design and Verification Tools
- eveda - Engineering Validation and Engineering Design Activity
- DVP - Design and Verification Plan
- DVER - Design rule VERification