What does C-DAY mean?
C-DAY means Commence Day; the unnamed Day on which a Deployment Operation begins
This acronym/slang usually belongs to Undefined category.
What is the abbreviation for Commence Day; the unnamed Day on which a Deployment Operation begins?
Commence Day; the unnamed Day on which a Deployment Operation begins can be abbreviated as C-DAY
|
|
Most popular questions people look for before coming to this page
Q: A: |
What does C-DAY stand for? C-DAY stands for "Commence Day; the unnamed Day on which a Deployment Operation begins". |
Q: A: |
How to abbreviate "Commence Day; the unnamed Day on which a Deployment Operation begins"? "Commence Day; the unnamed Day on which a Deployment Operation begins" can be abbreviated as C-DAY. |
Q: A: |
What is the meaning of C-DAY abbreviation? The meaning of C-DAY abbreviation is "Commence Day; the unnamed Day on which a Deployment Operation begins". |
Q: A: |
What is C-DAY abbreviation? One of the definitions of C-DAY is "Commence Day; the unnamed Day on which a Deployment Operation begins". |
Q: A: |
What does C-DAY mean? C-DAY as abbreviation means "Commence Day; the unnamed Day on which a Deployment Operation begins". |
Q: A: |
What is shorthand of Commence Day; the unnamed Day on which a Deployment Operation begins? The most common shorthand of "Commence Day; the unnamed Day on which a Deployment Operation begins" is C-DAY. |
Abbreviations or Slang with similar meaning
- C-day - unnamed day on which a deployment operation begins
- K-Day - The Day on which a Convoy(K) System Is Introduced or is due to be Introduced On
- D-day - unnamed day on which operations commence or are scheduled to commence
- M-day - unnamed day on which mobilization of forces begins
- D-Day - An unnamed day on which a particular operation commences or is to commence
- L-hour - specific hour on C-day at which a deployment operation commences or is to commence
- M-Day - mobilization day (unnamed day on which mobilization of forces begins)
- beam. - A measurement of a ship's width at its widest point. bearing. The compass direction in which a vessel is traveling.
- day at sea. - On a cruise ship, a full day on which the ship does not put into port.
- effective date. - The date on which a fare, or other offer, becomes valid.
- seating. - On a cruise ship, the specified time at which a passenger eats the evening meal. Typically, there are two seatings each night.
- usage date. - 1. The date on which a travel product is used or consumed, for example the day on which a client checks out of a hotel or returns a rental car. 2. The date after which a commission will be due a trave
- validity dates. - The inclusive dates for which a fare or other offer is good.
- C-Day - The unnamed day on which a deployment operation begins or is to begin
- D-Day - The unnamed day on which an operation begins or is to begin
- C-Day - Day in Which Movement From Origin Begins
- D-Day - Day in which a particular operation begins
- M-Day - Day on which mobilization begins
- D-DAY - Unnamed Day on which Operations are scheduled to Commence
- L-HOUR - Launch Hour (The specific hour on C-day at which a deployment operation commences)